The AEG and the installation of a modernizer view in Chile
This paper proposes an alternative vision of the entrance of the modern project related to the presence of the German firm AEG (Allgemeine Elektricitäts-Gesellschaft) and the inescapable link of this company with the figure of the German architect and designer Peter Behrens, one of the main drivers...
Na minha lista:
| Principais autores: | Vera, Rodrigo, Harris, Ronald, Bascuñán, Patricio |
|---|---|
| Formato: | Online |
| Idioma: | spa |
| Publicado em: |
Universidad Diego Portales
2019
|
| Acesso em linha: | https://www.revista180.udp.cl/index.php/revista180/article/view/564 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Registros relacionados
-
FEASIBILITY STUDY OF FOTOVOLTAIC SYSTEMS INSTALLATION IN TYPICAL HOUSES OF CIUDAD AUTONOMA DE BUENOS AIRES
por: Pilar, Claudia; Facultad de Ingeniería y Facultad de Arquitectura, UNNE, et al.
Publicado em: (2019) -
Guidelines for the improvement of design, procurement and installation of lifts using supply chain management concepts
por: Azambuja, Marcelo Marcelo Menna Barreto, et al.
Publicado em: (2008) -
Evaluation of the installed power of the pump equipment in the acuifero of the Sicarigua valley Municipio Torres / Lara Estate
por: López, Alirio Segundo, et al.
Publicado em: (2006) -
Stylistic contaminations in the work of Luciano Kulczewski. Juxtaposition of imageries as appropriation strategy
por: Harris Diez, Ronald Ernesto
Publicado em: (2018) -
Build the city: modernity and neo-rationalism between symbolism and functionality. A view from Europe to the architecture of Latin America
por: Vivas Ziarrusta, Isusko
Publicado em: (2016)