Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs

Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...

Full description

Saved in:
Bibliographic Details
Main Authors: Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques
Format: Online
Language:eng
Published: ANTAC - Associação Nacional de Tecnologia do Ambiente Construído 2021
Online Access:https://seer.ufrgs.br/ambienteconstruido/article/view/105064
Tags: Add Tag
No Tags, Be the first to tag this record!
id ojs-article-105064
record_format ojs
spelling ojs-article-1050642021-03-12T21:59:21Z Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs Santos, Mírian Caroline Farias Costa, Dayana Bastos Ferreira, Emerson de Andrade Marques Integration; Workflow; Cost estimating; Scheduling; Monitoring; BIM Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an information workflow that integrates 3D BIM modeling, cost estimating, scheduling, and monitoring processes in SMEs (ICSM Information Workflow). This research adopts the design science research approach, which includes (a) a literature review and a study of the information workflow among the processes, (b) a proposal of an information workflow based on certain assumptions for integration, (c) a participatory process for testing and adapting the proposed workflow, and (d) an evaluation of the proposed information workflow. The results indicate the participatory and cyclical processes that were proposed to define the work packages using a standard WBS and a database for information integration were the key for integrating people, technologies, and processes. The main contributions of this study are the proposal of an information workflow that integrates cost estimating, scheduling, and monitoring with BIM in SMEs, and the lessons learned based on the pilot test and evaluation of the ICSM Information Workflow in one of the two projects studied. ANTAC - Associação Nacional de Tecnologia do Ambiente Construído CAPES 2021-03-12 info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion https://seer.ufrgs.br/ambienteconstruido/article/view/105064 Ambiente Construído; v. 21, n. 2 (2021); 113-129 Ambiente Construído; v. 21, n. 2 (2021); 113-129 Ambiente Construído; v. 21, n. 2 (2021); 113-129 1678-8621 1415-8876 eng https://seer.ufrgs.br/ambienteconstruido/article/view/105064/60991 Direitos autorais 2021 Ambiente Construído https://creativecommons.org/licenses/by/4.0
institution Universidade Federal do Rio Grande do Sul
collection OJS
language eng
format Online
author Santos, Mírian Caroline Farias
Costa, Dayana Bastos
Ferreira, Emerson de Andrade Marques
spellingShingle Santos, Mírian Caroline Farias
Costa, Dayana Bastos
Ferreira, Emerson de Andrade Marques
Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
author_facet Santos, Mírian Caroline Farias
Costa, Dayana Bastos
Ferreira, Emerson de Andrade Marques
author_sort Santos, Mírian Caroline Farias
title Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
title_short Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
title_full Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
title_fullStr Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
title_full_unstemmed Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
title_sort information workflow proposal for integrating cost estimating, scheduling, and monitoring with bim in smes
description Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an information workflow that integrates 3D BIM modeling, cost estimating, scheduling, and monitoring processes in SMEs (ICSM Information Workflow). This research adopts the design science research approach, which includes (a) a literature review and a study of the information workflow among the processes, (b) a proposal of an information workflow based on certain assumptions for integration, (c) a participatory process for testing and adapting the proposed workflow, and (d) an evaluation of the proposed information workflow. The results indicate the participatory and cyclical processes that were proposed to define the work packages using a standard WBS and a database for information integration were the key for integrating people, technologies, and processes. The main contributions of this study are the proposal of an information workflow that integrates cost estimating, scheduling, and monitoring with BIM in SMEs, and the lessons learned based on the pilot test and evaluation of the ICSM Information Workflow in one of the two projects studied.
publisher ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
publishDate 2021
url https://seer.ufrgs.br/ambienteconstruido/article/view/105064
work_keys_str_mv AT santosmiriancarolinefarias informationworkflowproposalforintegratingcostestimatingschedulingandmonitoringwithbiminsmes
AT costadayanabastos informationworkflowproposalforintegratingcostestimatingschedulingandmonitoringwithbiminsmes
AT ferreiraemersondeandrademarques informationworkflowproposalforintegratingcostestimatingschedulingandmonitoringwithbiminsmes
_version_ 1709370649420496896