Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Bewaard in:
Hoofdauteurs: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Formaat: | Online |
Taal: | eng |
Gepubliceerd in: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Online toegang: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tags: |
Voeg label toe
Geen labels, Wees de eerste die dit record labelt!
|
Gelijkaardige items
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
door: Felisberto, Alexandre David, et al.
Gepubliceerd in: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
door: Silva, Paula Heloisa da, et al.
Gepubliceerd in: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
door: Venkatachalam, Senthilkumar, et al.
Gepubliceerd in: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
door: Brito, Douglas Malheiro de, et al.
Gepubliceerd in: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
door: Melo, Adriana Virgínia Santana, et al.
Gepubliceerd in: (2013)