Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Salvato in:
Autori principali: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Natura: | Online |
Lingua: | eng |
Pubblicazione: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Accesso online: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne! !
|
Documenti analoghi
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
di: Felisberto, Alexandre David, et al.
Pubblicazione: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
di: Silva, Paula Heloisa da, et al.
Pubblicazione: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
di: Venkatachalam, Senthilkumar, et al.
Pubblicazione: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
di: Brito, Douglas Malheiro de, et al.
Pubblicazione: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
di: Melo, Adriana Virgínia Santana, et al.
Pubblicazione: (2013)