Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Uloženo v:
Hlavní autoři: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Médium: | Online |
Jazyk: | eng |
Vydáno: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
On-line přístup: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
Podobné jednotky
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
Autor: Felisberto, Alexandre David, a další
Vydáno: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
Autor: Silva, Paula Heloisa da, a další
Vydáno: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
Autor: Venkatachalam, Senthilkumar, a další
Vydáno: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
Autor: Brito, Douglas Malheiro de, a další
Vydáno: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
Autor: Melo, Adriana Virgínia Santana, a další
Vydáno: (2013)