Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Saved in:
Main Authors: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Format: | Online |
Sprog: | eng |
Udgivet: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Online adgang: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tags: |
Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!
|
Lignende værker
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
af: Felisberto, Alexandre David, et al.
Udgivet: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
af: Silva, Paula Heloisa da, et al.
Udgivet: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
af: Venkatachalam, Senthilkumar, et al.
Udgivet: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
af: Brito, Douglas Malheiro de, et al.
Udgivet: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
af: Melo, Adriana Virgínia Santana, et al.
Udgivet: (2013)