Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Enregistré dans:
Auteurs principaux: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Format: | Online |
Langue: | eng |
Publié: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Accès en ligne: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
par: Felisberto, Alexandre David, et autres
Publié: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
par: Silva, Paula Heloisa da, et autres
Publié: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
par: Venkatachalam, Senthilkumar, et autres
Publié: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
par: Brito, Douglas Malheiro de, et autres
Publié: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
par: Melo, Adriana Virgínia Santana, et autres
Publié: (2013)