Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Saved in:
Main Authors: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Formáid: | Online |
Teanga: | eng |
Foilsithe: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Rochtain Ar Líne: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Clibeanna: |
Cuir Clib Leis
Gan Chlibeanna, Bí ar an gcéad duine leis an taifead seo a chlibeáil!
|
Míreanna Comhchosúla
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
le: Felisberto, Alexandre David, et al.
Foilsithe: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
le: Silva, Paula Heloisa da, et al.
Foilsithe: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
le: Venkatachalam, Senthilkumar, et al.
Foilsithe: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
le: Brito, Douglas Malheiro de, et al.
Foilsithe: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
le: Melo, Adriana Virgínia Santana, et al.
Foilsithe: (2013)