Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Сохранить в:
Главные авторы: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Формат: | Online |
Язык: | eng |
Опубликовано: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Online-ссылка: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
Схожие документы
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
по: Felisberto, Alexandre David, et al.
Опубликовано: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
по: Silva, Paula Heloisa da, et al.
Опубликовано: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
по: Venkatachalam, Senthilkumar, et al.
Опубликовано: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
по: Brito, Douglas Malheiro de, et al.
Опубликовано: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
по: Melo, Adriana Virgínia Santana, et al.
Опубликовано: (2013)