Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Shranjeno v:
Main Authors: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Format: | Online |
Jezik: | eng |
Izdano: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Online dostop: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Oznake: |
Označite
Brez oznak, prvi označite!
|
Podobne knjige/članki
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
od: Felisberto, Alexandre David, et al.
Izdano: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
od: Silva, Paula Heloisa da, et al.
Izdano: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
od: Venkatachalam, Senthilkumar, et al.
Izdano: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
od: Brito, Douglas Malheiro de, et al.
Izdano: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
od: Melo, Adriana Virgínia Santana, et al.
Izdano: (2013)