Construction duration predictive model based on factorial analysis and fuzzy logic
Setting the building construction duration for vertical residential works is made still in the study phase of economic and financial feasibility of the project and, in most cases, in an empirical way, increasing the uncertainties and the risks to fulfill the set deadline. However, there are computat...
Αποθηκεύτηκε σε:
Κύριοι συγγραφείς: | Maués, Luiz Maurício Furtado, Sá, José Alberto Silva de, Costa Junior, Carlos Tavares da, Kern, Andrea Parise, Duarte, André Augusto Azevedo Montenegro |
---|---|
Μορφή: | Online |
Γλώσσα: | eng |
Έκδοση: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2019
|
Διαθέσιμο Online: | https://seer.ufrgs.br/ambienteconstruido/article/view/79907 |
Ετικέτες: |
Προσθήκη ετικέτας
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
|
Παρόμοια τεκμήρια
-
Reintegration of the Factory to the City, through the Parasitism and Urban Regeneration
ανά: Andica Pérez, Luis Felipe, κ.ά.
Έκδοση: (2020) -
Comparison of machine learning techniques for predicting energy loads in buildings
ανά: Duarte, Grasiele Regina, κ.ά.
Έκδοση: (2017) -
Construction delays: a case study in the Brazilian Amazon
ανά: Maués, Luiz Mauricio Furtado, κ.ά.
Έκδοση: (2017) -
Research and creativity :a factory of special ideas
ανά: Díaz Moreno, Cristina, κ.ά.
Έκδοση: (2007) -
Domus method for predicting sunlit areas on interior surfaces
ανά: Rocha, Ana Paula de Almeida, κ.ά.
Έκδοση: (2018)