Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Gardado en:
Main Authors: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Formato: | Online |
Idioma: | eng |
Publicado: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Acceso en liña: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|
Títulos similares
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
por: Felisberto, Alexandre David, et al.
Publicado: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
por: Silva, Paula Heloisa da, et al.
Publicado: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
por: Venkatachalam, Senthilkumar, et al.
Publicado: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
por: Brito, Douglas Malheiro de, et al.
Publicado: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
por: Melo, Adriana Virgínia Santana, et al.
Publicado: (2013)