Information workflow proposal for integrating cost estimating, scheduling, and monitoring with BIM in SMEs
Although many studies have emphasized the benefits of the integration of Building Information Modeling (BIM), there is no consensus on the information workflow among main processes used in construction, particularly in small- and medium-size enterprises (SMEs). Therefore, this work proposes an infor...
Kaydedildi:
Asıl Yazarlar: | Santos, Mírian Caroline Farias, Costa, Dayana Bastos, Ferreira, Emerson de Andrade Marques |
---|---|
Materyal Türü: | Online |
Dil: | eng |
Baskı/Yayın Bilgisi: |
ANTAC - Associação Nacional de Tecnologia do Ambiente Construído
2021
|
Online Erişim: | https://seer.ufrgs.br/ambienteconstruido/article/view/105064 |
Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|
Benzer Materyaller
-
BIM cost estimation guidelines for Brazilian public sector infrastructure
Yazar:: Felisberto, Alexandre David, ve diğerleri
Baskı/Yayın Bilgisi: (2021) -
BIM 4D in construction scheduling: details, benefits and difficulties
Yazar:: Silva, Paula Heloisa da, ve diğerleri
Baskı/Yayın Bilgisi: (2019) -
ANALYSIS OF WORKFLOW ON DESIGN PROJECTS IN INDIA
Yazar:: Venkatachalam, Senthilkumar, ve diğerleri
Baskı/Yayın Bilgisi: (2010) -
Avaliação de estratégias para representação e análise do planejamento e controle de obras utilizando modelos BIM 4D
Yazar:: Brito, Douglas Malheiro de, ve diğerleri
Baskı/Yayın Bilgisi: (2015) -
Fatores críticos para a produção de agregado reciclado em usinas de reciclagem de RCC da região nordeste do Brasil
Yazar:: Melo, Adriana Virgínia Santana, ve diğerleri
Baskı/Yayın Bilgisi: (2013)